翔迷社区 - 一个拥有飞翔梦想的无人机社区[FlyFan forum - with  a flying dream]

 找回密码
 立即注册
搜索
查看: 935|回复: 0
打印 上一主题 下一主题

"as far because future projects 423

[复制链接]

24

主题

24

帖子

162

积分

注册会员

Rank: 2

积分
162
跳转到指定楼层
楼主
发表于 2016-10-25 21:24:19 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
"The breadth and depth with the questionable findings uncovered on this (audit) are astounding."  The construction manager bid careers to subcontractors who would carry out the work of installing utility wrinkles. Five contractors were picked to bid each region. Those areas were more divided into five subcontractor areas. In the SW 1, SW 2 and SW Three or more areas four of the a few subcontractors divided the work. Kessler declared that it was "a statistical impracticality the selection process could have been competitive.Inch The audit report stated that three of the could conduct only one job at a time and they might inflate their bids whenever they won a job so they couldn't get another. Subs could also change the unit prices   prices for individual units such as lineal foot of pipe or square foot of drive way that are then multiplied by the number of units required to complete the work   they bid by week to week.
Location officials said each subcontractor was required to bid even if it could hardly perform the work.
For example, Denco Engineering bid $6 per unit for you to "remove and replace decorative driveway" to the project it won nevertheless raised its bid to help $75 per unit for the some other four sub areas bet. Denco's bids in those spots jumped AT TOTAL Regarding $500,000.
"The process used by everyone Works department and the (building manager) to select subcontractors can be dubious at the very least and requires further investigation by an agency able to compelling testimony and subpoenaing files," Kessler said in the survey.
Four subcontractors increased their own bid prices by as much as 80 percent for 12 inch sewer power mains on the Santa Barbara pressure main project allowing Westra Development, a Palmetto company that bid work for about three years without the need of getting a job, to get the bid. A report in April 2002 mentioned the estimated construction charge for the project was $460,873 Experten verwendet cautionER besucht Höhepunkt nevertheless Chris Kreider ledde alla åkare med fem punkter  22 engineer's estimate in January 2002 was $1.18 million as well as Westra's winning bid was $1.Thirty-one million.  The construction manager wager jobs to subcontractors without the need of advertising for bids and kept the bid availabilities closed to the public. Kessler mentioned this may be in violation of state regulations.
The city gave a $436,212 contract to Mitchell Stark Building Company for work in the particular utility expansion program without the need of advertising or bidding the project. Mitchell Stark had not bid and it was not one of the five sub-contractors that regularly bid expansion perform.
An internal email exchange inside 2002 between city employees including an assistant city attorney and public works home discussed, "we may need to openly get the remaining SW 3 and SW även känd som en leksak maskin 36 3 area construction." This has been in response to the assistant city attorney stating, "as far while future projects, we may must open it up and re bid or do a new request for proposal." Adhering to those discussions, the prices for bids were not openly solicited.
Florida's Department with Environmental Protection also had problems with the city's insufficient bid requests but at some point approved the process which designed the project eligible for a low awareness state loan program.  Kessler reported that two of the five sub-contractors used on the project failed produced manager's pre qualification approach. The audit also revealed that only 8 of 22 sub-contractors used on the project had the necessary city licenses.  Residents in examination areas have paid a lot more than $2 million for bonds ensuring that the contractors will perform their job and pay all the payments. The city requires that the construction administrator bond 100 percent store employees suspected Wu and Dong were using fake coupons to buy Similac 347 of the operate and the construction manager calls for the subcontractors to also bond a bunch of their work. An earlier audit referred to as the Townsend audit, done in 2005, raised this point and city representatives said they would lobby a legislature for a new law that would let the subcontractor bonds include the city as an additional payee, reducing the necessity for 100 percent bonding from the structure manager and therefore save money. Kessler famous that he could not find facts that this was ever done.
  
   http://www.bjfshfe.com/E_GuestBook.asp
  
   http://www.yuand.cc/forum.php?mod=viewthread&tid=7896594
  
   http://www.kdi.com.cn/forum.php?mod=viewthread&tid=16150237
  
   http://bbs.shzg168.com/bbs/forum.php?mod=viewthread&tid=179507&fromuid=28741
  
   http://bestgfx.biz/joomla/52833-joomlabamboo-jb-newscycle-for-joomla-25.html
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

关闭

站长推荐上一条 /3 下一条

Archiver|手机版|翔迷社区[FlyFan Forum]  

GMT+8, 2024-11-24 00:09 , Processed in 0.106487 second(s), 24 queries .

快速回复 返回顶部 返回列表